K.W.Emerson,Inc partnered with Amador County to install a 60 inch Corrugated Metal Pipe and inflatable plug to regulate water flow between Rabbit Creek and Camamche Reservoir . This project involved excavating the Causeway down approximately 50ft. using Cat 631 scrappers, D8R Bulldozer and a Cat 330 Excavator to an acceptable elevation.  After installation of the 60 inch CMP a concrete slurry plug was pumped around the collar of the pipe to keep the pipe in place while back filling took place. Again using the 631 Scrappers dirt was hauled back in to the Causeway and compacted with a 815 compactor. Upon completion of  back filling the road was base rocked and paved before returning to service.

 

2014-09-25_09-49-58_374

IMG_20141008_093542084

2014-10-08_13-25-51_969

FullSizeRender

NEXT: Pit 3 Tunnel Rock Creek Crossing Gallery

Featured Projects

Partnered with Sacramento Municipal Utilities District  the Emerson team worked closely with our subcontractors for this project. Constructing two concrete weirs to help measure the flows of Rubicon river and Silver creek near the Ice

View project
Contractor Login
T (209)754-3839 OR (888)WE-BURST .F (209) 754-3830 413 West St. Charles Street, P.O. Box 549, San Andreas, CA. 95249
© K.W.EMERSON, Inc, 2012. GENERAL ENGINEERING CONSTRUCTION COMPANY. Web Site by Visualscope